Building work continues
May. 2nd, 2014 12:42 pmMost of the inside work is now completed. Floors and ceilings can be put back. However, it has become apparent that the front room ceiling needs to come down completely. Somehow I need to find space for a lathe and dust extractor, not to mention the half a ton of wood that is currently stored in there. There's no room in the garage due to builder's gear being in there,no room in the loft due to the floor being missing (not that I want to lug it all up there). All bedrooms are in turmoil due to wardrobe having to be emptied due to the damp. Looks like the dining room will have to be utilised. One thing is for sure... once the front room is empty, it stays empty! That way I can start on the floor in there, that's after the radiator is removed, windows replaced, plastering, wiring, architrave, coving...